Our Projects

A portfolio of completed and ongoing civil, mechanical and marine engineering projects across Bangladesh.

Portfolio: Oishi Enterprise
Ongoing Alfa Engineering

Alfa Automated Conveyor & HVAC Fabrication

Fabrication of specialized heavy-duty conveyor gantries and industrial ventilation ductwork for manufacturing plant.

Narayanganj BSCIC Ha-Meem Industrial Park Started: March 1, 2024
100 Feet Khal Gap Sealing Work
Ongoing Oishi Enterprise

100 Feet Khal Gap Sealing Work

Driving FRP Sheet Pile, Laying CGM, Sealing Work

Kuril Bishwa Road 24 ECB Bangladesh Army 2021 – 2023
Ongoing Oishi Enterprise

23 Substation in Dhaka

Geotechnical Investigation, Laboratory Test, and Report Submission

DPDC 2021 – 2023
6 Basement + 25 Storied Commercial Building
Completed Oishi Enterprise

6 Basement + 25 Storied Commercial Building

350 Nos 750 mm Dia Shore Pile

Gulshan, Dhaka Aslam Serniabath 2023 – 2024
Construction of Plaza & Beautification Work
Completed Oishi Enterprise

Construction of Plaza & Beautification Work

Construction Plaza, Walkway, Stamp Concrete, Erosion Block, Tree Plantation

Kalshi, Dhaka 24 ECB Bangladesh Army 2022 – 2023
Completed Alfa Engineering

Alfa Industrial Steel Warehouse Structure

Turnkey structural steel fabrication and erection of 45,000 sq.ft industrial warehouse facility including crane gantries.

Gazipur Industrial Zone Apex Holdings Ltd. February 1, 2022 – May 15, 2023
Completed Alfa Engineering

Alfa High-Precision Piping & Mechanical Skid

Engineering design, CNC machining, and mechanical installation of modular fuel gas conditioning skids.

Ashuganj Power Hub United Power Generation August 1, 2021 – November 30, 2022
Completed Oishi Enterprise

Construction of 8 Nos Bridge & 2 Nos at Gradge Intersection

750 mm & 900 mm dia. Bored pile

Purbachal Link Road 24 ECB Bangladesh Army 2020 – 2021
Completed Oishi Enterprise

GPUF Temporary Jetty

Topographic Survey, Bathymetric Survey, Structural Design for Main Jetty & RoRo Jetty

Polash, Narsingdi Bangladesh Chemical Industries Corporation
Completed Oishi Enterprise

SSG Bizz Center Shore Piling Construction

600 mm dia Shore Pile 750 mm dia Kingpost pile

Super Star Group
Completed Oishi Enterprise

400 MW Gas Based Combined Cycle Power Plant

600 mm dia& 800 mm dia Test Piles & Testing. 600 mm Dia Cast in Situ Pile, 144 Nos 800 mm Dia Cast in Situ Pile, 314 Nos

Ashuganj Ashuganj Power Station Company Ltd.
Completed Oishi Enterprise

400 MW Gas Based Combined Cycle Power Plant

Geotechnical Investigation, Laboratory Test and Report submission

Ashuganj Ashuganj Power Station Company Ltd 2018 – 2019
Completed Oishi Enterprise

DPDC 8 Nos. 33/11 KV

Architectural & Structural

DPDC
Completed Oishi Enterprise

150 MW HFO Power Plant Ashuganj

Whole Plant Indoor & Outdoor Firefighting Work

Midland East Power Ltd 2017 – 2018
Completed Oishi Enterprise

GIS Sub-station project

Design of DPDC 8 Nos. 33/11 KV GIS Substation Project.

DPDC
Completed Oishi Enterprise

Matarbari Ultra Super Critical Coal-Fired Power Plant

Cast-in-situ piling work (Dia. 600 mm, 32 m long) & PIT.

Moheshkhali, Cox's Bazar POSCO Engineering & Construction Co. Ltd.
Completed Oishi Enterprise

Construction of 44.68m Long PC Girder Kashipur Bridge

Construction of 33.68 m Long PC Girder Kashipur Bridge.

BBA Implementation Authority, Bangladesh Army 2017 – 2018
Completed Oishi Enterprise

150 MW HFO Power Plant Project

Supply, installation, and commissioning of Deep Tube Well

Ashuganj Midland Group
Completed Oishi Enterprise

150 MW HFO Power Plant Project

Topographic Survey, Sub-soil Investigation, Soil Resistivity Test, Test Pile & Load Test.

Ashuganj Midland Group
Completed Oishi Enterprise

Dhaka-Khulna (N-8) Project

Test Pile by Using Hydraulic Rig & Load Test

Bhanga, Faridpur RHD
Completed Oishi Enterprise

2 x 600 MW Ultra Critical Coal-Fired Power Plant Project

Manufacturing 6 m long steel dredge pipe 500 mm dia, 8 mm thick plates rolled and welded

Matarbari PDB
Completed Oishi Enterprise

AUCTUS, BATB

Load Test (16 No.)

British American Tobacco
Completed Oishi Enterprise

8 No. 33/11 KV GIS Substations

Site preparation work, topographic survey, subsoil investigation, soil resistivity test, test pile & load test

DPDC
Completed Oishi Enterprise

Construction of Factory Building

Cast-in-site piling by Rotary Drilling Rig

Partex Group
Completed Oishi Enterprise

Shantahar & Katakhali 50MW HFO Power Plant

Construction of Rectification of Civil Work, Road Repairing & Deep Tubewell

BPDB